Risk

This is a Primavera Cloud field supported by the Integration app.

Description: The risk object represents a probabilistic event or condition which if it occurs has an impact on the project.

Primavera Cloud Field

Description

Read-Only

activityImpactQuantified

Indicates when an Activity is linked to a Risk.

Yes

actualCostImpact

The actual cost impact due to the risk occurring.

No

actualResponseCost

The actual base currency cost of implementing the response action.

No

actualResponseCostProject

The actual project currency cost of implementing a response action.

Yes

actualScheduleImpact

The actual schedule impact due to the risk occurring.

No

addressLine1

The first line of the address for the location. This might be the building number and street address.

No

addressLine2

The second line of the address for the location. This might be the building number and street address.

No

cause

A description of the cause of the risk.

No

cityName

The name of the city for the location.

No

contingency

The allowable risk cost should the risk occur.

No

costImpactQuantified

Determines whether the cost impact is overridden.

No

description

A detailed summary of the risk.

No

effect

The resulting effect of the presence of the risk.

No

hasPostResponseData

etermines whether the risk has post-response values.

No

impactedDate

The date the risk impacted the project.

No

latitude

The geographical coordinate for the latitude of the location.

No

locationName

A name for the location that users will understand and recognize.

No

longitude

The geographical coordinate for the longitude of the location.

No

identifiedDate

The date the risk was added to the project.

No

plannedResponseCost

The estimated cost associated with implementing the response action.

No

plannedResponseCostProject

The estimated project currency cost of implementing a response action.

Yes

postalCode

The postal code, post code, or zip code of the location.

No

postExposureCost

The mean post-response probability of the risk multiplied by the mean post-response cost impact of the risk using base currency.

Yes

postExposureCostProject

The mean post-response probability of the risk multiplied by the mean post-response cost impact of the risk using project currency.

Yes

postQuantifiedCostThreshold

The estimated impact size that the risk will have on the project cost after implementing a response action.

Yes

postResponseMeanCostImpact

The cost the risk contributes to the total project post-response average cost.

Yes

postResponseMeanDelay

The duration the risk contributes to the total project post-response average delay.

Yes

postResponsePessimisticCostDeltaAbs

The variance in the project post-response pessimistic cost caused by removing the risk during a risk analysis.

Yes

postResponsePessimisticFinishDeltaAbs

The variance in the project post-response pessimistic finish caused by removing the risk during a risk analysis.

Yes

postScore

The risk calculation based on the post-response values defined for probability, cost impact, schedule impact, and any additional user-defined impacts for the risk.

Yes

preExposureCost

The mean pre-response probability of the risk multiplied by the mean pre-response cost impact of the risk using base currency.

Yes

preExposureCostProject

The mean pre-response probability of the risk multiplied by the mean pre-response cost impact of the risk using project currency.

Yes

preQuantifiedCostThreshold

The estimated impact size that the risk will have on the project cost before implementing a response action.

Yes

preResponseMeanCostImpact

The cost the risk contributes to the total project pre-response average cost.

Yes

preResponseMeanDelay

The duration the risk contributes to the total project pre-response average delay.

Yes

preResponsePessimisticCostDeltaAbs

The variance in the project pre-response pessimistic cost caused by removing the risk during a risk analysis.

Yes

preResponsePessimisticFinishDeltaAbs

The variance in the project pre-response pessimistic finish caused by removing the risk during a risk analysis.

Yes

probabilityImpactQuantified

Determines whether the probability impact is overridden.

No

projectCode

The short name of the associated project.

Yes

projectId

The unique ID of the associated project.

No

projectRiskId

The unique ID generated by the system.

No

quantifiedPostResponseProbabilityThreshold

The probability threshold that a risk will occur after implementing a response action.

Yes

quantifiedPostResponseScheduleThreshold

The estimated impact size that the risk will have on the project schedule after implementing a response action.

Yes

quantifiedProbabilityThreshold

The estimated probability that a risk will occur before implementing a response action.

Yes

quantifiedScheduleThreshold

The estimated impact size that the risk will have on the project schedule before implementing a response action.

Yes

riskCode

The unique identifier for the risk.

No

riskName

The name of the risk.

No

riskStatus

The current status of the Risk. Valid values are 'Proposed', 'Open', 'Active', 'Rejected', 'Managed', and 'Impacted'.

No

riskType

The type of risk. Threat: A risk that can negatively impact the project. Opportunity: A risk that can benefit the project.

No

scheduleImpactQuantified

Determines whether the schedule impact is overridden.

No

score

The risk calculation based on the pre-response values defined for probability, cost impact, schedule impact, and any additional user-defined impacts for the risk

Yes

stateCode

The code for the state, region, or province of the location.

No

stateName

The name of the state, region, or province of the location.

No

workspaceCode

The unique identifier of the workspace.

Yes