Work Packages Overview
Work packages are used to breakdown the work defined in the WBS into smaller deliverables. Each work package contains a combination of the materials and steps needed to satisfy its deliverable. A work package that does not have any scope items assigned can be considered a planning package. The WBS ties the work package and the scope assignments to the schedule. Activities can be assigned to work packages.
Last Published Tuesday, November 19, 2024