Assign a Strategy to a Single Project or Program
Projects or programs are typically aligned with strategies in the Strategy List at the workspace level. You can also assign strategies to individual projects or programs by linking the two objects at the project or program level.
To assign a strategy to a project or program:
- In the object selector, select
Project or
Program, and then select a project or a program from the list.
- From the
Main Menu, select
Strategic Alignment, and then select Strategy List.
- Select Assign.
- In the Link Strategies dialog box, select a strategy, and select OK.
- In the Percentage Alignment column, enter the degree of alignment the project has to the strategy.
- Select Save.