Override Cost Impact Thresholds
Use the Cost Impact detail window to manually override the pre-response and post-response cost impact thresholds for a risk. Manually input thresholds offer a greater level of specification than the risk threshold ranges assigned to the project or program. You can also use the detail window to specify cost impact when there is no matrix assigned to the project or program.
To override cost impact thresholds for a risk:
- In the object selector, select ﱆ Project or Program, and then select a project or a program from the list.
- From the Main Menu, select Risk, and then select Risk Register.
- In the table, select a risk.
- Select the Cost Impact detail window.
- To manually enter pre-response cost impact information, select Override Cost Threshold.
In the Pre-Response section, enter pre-response cost impact details.
- To manually enter post-response cost impact information, select Respond.
Note: Override Cost Threshold and Respond must be selected in the detail window to manually enter post-response cost impact information.
In the Post-Response section, enter post-response cost impact details.
- Select Save.
Tips
- To use the assigned cost impact thresholds for the selected risk, clear the Override Cost Threshold check box or Respond check box, and then select a threshold value in the Pre-Response Cost or Post-Response Cost column.
- To make cost impacts available on the project Cost Sheet, assign CBS codes and cost categories to the projects risks in the table using the CBS Code and Cost Category columns.
- You cannot enter cost impact values for risks with a type of Weather.